Central Utah Project (CUP): Bonneville Unit - Historic Reclamation Projects Book - Water Projects, Flood Control, Starvation Dam, Reservoirs, Aqueducts, Tunnels, Canals, Power Plants

Nonfiction, Science & Nature, Technology, Engineering, Civil
Cover of the book Central Utah Project (CUP): Bonneville Unit - Historic Reclamation Projects Book - Water Projects, Flood Control, Starvation Dam, Reservoirs, Aqueducts, Tunnels, Canals, Power Plants by Progressive Management, Progressive Management
View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart
Author: Progressive Management ISBN: 9781310197529
Publisher: Progressive Management Publication: September 26, 2014
Imprint: Smashwords Edition Language: English
Author: Progressive Management
ISBN: 9781310197529
Publisher: Progressive Management
Publication: September 26, 2014
Imprint: Smashwords Edition
Language: English

The Central Utah Project (CUP) is a massive and complicated water development project. It is the largest in the State of Utah. The ultimate plans for the CUP were among the largest and most complex contemplated by the Bureau of Reclamation. To make the project more manageable, Reclamation broke the initial phase of the CUP into four independent projects which could be united by the ultimate phase. Of the four units authorized by Congress as the initial phase, the largest and most complex is the Bonneville Unit, which itself is broken into interconnected parts. Reclamation's plans called for ten new reservoirs; enlargement of two existing reservoirs; 140 miles of aqueducts, tunnels, and canals; three power plants; nine pumping stations; and 200 miles of pipe drains. Because of its size and complexity, it is the Bonneville Unit that people most frequently associate with the CUP, sometimes to the exclusion of the Vernal and Jensen Units, which have been constructed to benefit communities in the Uinta Basin.

The history of the CUP is as large and complex as the project itself. And as with the project, the popular notion is that the history of the Bonneville Unit is the history of the CUP. There is some validity in this assumption. Certainly the history of the other units of the CUP, particularly those that were not built, includes colorful stories of the struggles to push forward a vision—engineering challenges, political intrigue, battles with opponents, courtroom drama, and the like. But the history of the CUP is filled with all of these. The history of the CUP is a microcosm of the large history of the battles over the Colorado River, wrapped with a thick layer of its own unique history.

Project Location * Historical Setting * Project Authorization * Construction History * Starvation Complex * Starvation Dam * Knight Diversion Dam * Starvation Feeder Conduit * Bottle Hollow * Strawberry Aqueduct and Collection System * Water Hollow Tunnel - Channel Number 2 * Soldier Creek Dam * Layout and Currant Tunnels * Jordan Aqueduct Reach I and II * Currant Creek Dam * Vat Tunnel * Stillwater Tunnel * "Hit List" * West Fork Pipeline- Vat Diversion Dam and 404 permits * Hades and Rhodes Tunnels * Supplemental Repayment Contract Jordan Aqueduct-Reach III and IV-TPA Lawsuit * Upper Stillwater Dam * North Fork Siphon * Doc's, Hades, Win, and Rhodes Diversions and Feeder Pipelines * Jordanelle Dam * Diamond Fork Power System - Syar Tunnel and Sixth Water Flow Control Structure * CUP Completion Act * Post Construction History * Bonneville Irrigation and Drainage System - Utah Lake System * Diamond Fork System * Settlement of Project Lands * Uses of Project Water * Conclusion

View on Amazon View on AbeBooks View on Kobo View on B.Depository View on eBay View on Walmart

The Central Utah Project (CUP) is a massive and complicated water development project. It is the largest in the State of Utah. The ultimate plans for the CUP were among the largest and most complex contemplated by the Bureau of Reclamation. To make the project more manageable, Reclamation broke the initial phase of the CUP into four independent projects which could be united by the ultimate phase. Of the four units authorized by Congress as the initial phase, the largest and most complex is the Bonneville Unit, which itself is broken into interconnected parts. Reclamation's plans called for ten new reservoirs; enlargement of two existing reservoirs; 140 miles of aqueducts, tunnels, and canals; three power plants; nine pumping stations; and 200 miles of pipe drains. Because of its size and complexity, it is the Bonneville Unit that people most frequently associate with the CUP, sometimes to the exclusion of the Vernal and Jensen Units, which have been constructed to benefit communities in the Uinta Basin.

The history of the CUP is as large and complex as the project itself. And as with the project, the popular notion is that the history of the Bonneville Unit is the history of the CUP. There is some validity in this assumption. Certainly the history of the other units of the CUP, particularly those that were not built, includes colorful stories of the struggles to push forward a vision—engineering challenges, political intrigue, battles with opponents, courtroom drama, and the like. But the history of the CUP is filled with all of these. The history of the CUP is a microcosm of the large history of the battles over the Colorado River, wrapped with a thick layer of its own unique history.

Project Location * Historical Setting * Project Authorization * Construction History * Starvation Complex * Starvation Dam * Knight Diversion Dam * Starvation Feeder Conduit * Bottle Hollow * Strawberry Aqueduct and Collection System * Water Hollow Tunnel - Channel Number 2 * Soldier Creek Dam * Layout and Currant Tunnels * Jordan Aqueduct Reach I and II * Currant Creek Dam * Vat Tunnel * Stillwater Tunnel * "Hit List" * West Fork Pipeline- Vat Diversion Dam and 404 permits * Hades and Rhodes Tunnels * Supplemental Repayment Contract Jordan Aqueduct-Reach III and IV-TPA Lawsuit * Upper Stillwater Dam * North Fork Siphon * Doc's, Hades, Win, and Rhodes Diversions and Feeder Pipelines * Jordanelle Dam * Diamond Fork Power System - Syar Tunnel and Sixth Water Flow Control Structure * CUP Completion Act * Post Construction History * Bonneville Irrigation and Drainage System - Utah Lake System * Diamond Fork System * Settlement of Project Lands * Uses of Project Water * Conclusion

More books from Progressive Management

Cover of the book Golden Legacy, Boundless Future: Essays on the United States Air Force and the Rise of Aerospace Power - Army Air Corps, Logistics, Space, Cold War Reconnaissance, B-52, Korean War, Nuclear, Missiles by Progressive Management
Cover of the book FEMA U.S. Fire Administration The Changing Face of the Fire Service: A Handbook on Women in Firefighting - Recruitment, Reproductive Issues, Sexual Harassment, Protective Clothing by Progressive Management
Cover of the book Rolling Thunder 1965: Anatomy of a Failure - Airpower Against North Vietnam, Enduring Enigma of the Vietnam War, American Air Power Doctrine, President Johnson's Target Selection and Military Distrust by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: Corps Operations FM 3-92 (FM 100-15) - Headquarters Organization, Command Post and Cell, Full Spectrum Operations (Professional Format Series) by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: Reconstitution - FM 100-9 (Value-Added Professional Format Series) by Progressive Management
Cover of the book 21st Century U.S. Military Documents: Guide to Services Contingency Planning: Mortuary Affairs, Search And Recovery (S&R) - Air Force Handbook 10-247, Volume 4 - Aircraft Crashes by Progressive Management
Cover of the book A Plan for the Future: 10-Year Strategy for the Air Traffic Control Workforce 2011-2020, TRACON, Terminal and En Route Services, Training and Hiring Process, Staffing Requirements by Progressive Management
Cover of the book The Office of the Secretary of the Air Force 1947-1965: World War II, Symington, Berlin Airlift, Battle over B-36, Korean War, Scientist Secretary, Missiles, Air Force Academy, ARPA, NASA, B-70 by Progressive Management
Cover of the book U.S. Interpretation of International Space Policies Regarding Commercial Resource Acquisitions: Evolving Space Laws and Treaties, Legalizing Commercial Space Mining on the Moon and Asteroids by Progressive Management
Cover of the book A Game of Simon Says: Latin America's Left Turn and Its Effects on U.S. Security - Trend Toward Communism, Venezuela's Chavez and Bolivia's Morales, LAC, Mexico, Need for Fairer Trade Agreements, Aid by Progressive Management
Cover of the book The End of the Beginning: On the Application of Aerospace Power in an Age of Fractured Sovereignty, Trends 2020, Demography, Technology, Military, Social, Operations with Blurred Boundaries by Progressive Management
Cover of the book Economic Security: Neglected Dimension of National Security? Energy, Workforce, Innovation, Debt and Deficits, Entitlement Programs, American History, Industrial Base by Progressive Management
Cover of the book 21st Century U.S. Military Manuals: Operations in a Low-Intensity Conflict Field Manual - FM 7-98 (Value-Added Professional Format Series) by Progressive Management
Cover of the book Making the Case for Humanitarian Intervention: National Interest and Moral Imperative - Media, Rwanda, Somalia, Bosnia, Haiti, Genocide, Kosovo, Libya, Congressional Action, Implications for Future by Progressive Management
Cover of the book FBI Report: National Gang Threat Assessment (NGTA) Emerging Trends - Street Gangs, Drug Cartels, Regional and State Breakdowns, Expansion of Non-Traditional Gangs by Progressive Management
We use our own "cookies" and third party cookies to improve services and to see statistical information. By using this website, you agree to our Privacy Policy